UPS engineering calculators
Free, anonymous, mobile-friendly calculators for UPS dealers and system integrators worldwide. Backed by IEC 60364, IEEE 1188, IEEE 519, NFPA 110 and major OEM datasheets. No account needed.
Battery
Battery Replacement Date Estimator
Predict when a UPS battery will need replacement based on temperature, chemistry, and duty cycle.
UPS Battery Runtime Calculator
Calculate runtime in minutes from load, battery capacity, voltage, and chemistry. WPC and Peukert methods.
Sizing
Power distribution
Power quality
Generator
Generator + UPS Compatibility Checker
Right-size a backup generator for your UPS, accounting for rectifier topology, step load, and site derating.
Generator Fuel Autonomy
Diesel BSFC curve + altitude / temperature derating + NFPA 110 Class and 133 % tank check.
UPS room
Maintenance
Business case
Cost of Downtime Calculator
Estimate the real cost of an outage — productivity, revenue, recovery — with Ponemon / ITIC / Uptime benchmarks.
UPS TCO Calculator
5-yr total cost of ownership: CapEx + power loss + maintenance + battery refresh, discounted to NPV.
Logistics
All 13 Power Stack engineering calculators are live. Tell us what to build next at hello@power-stack.io.